The raw material of the carbon steel pipe is a round tube blank. The round tube embryo must be cut by the cutting process of about 1 meter by cutting and processing of the cutting machine, and it is sent to the furnace to heat it through the teleport belt. The billet was sent to the furnace to heat, and the temperature was about 1200 degrees Celsius. The fuel is hydrogen or acetylene. The temperature control in the furnace is a key problem. After the round tube blank is released, it must be put through the pressure perforation machine. Generally, the more common perforation machines are tapered roller perforation machines. This perforation machine has high production efficiency, good product quality, large ductors, and can wear a variety of steel species. After perforation, the round tube blank was rolled, rolled or squeezed by three rollers. After squeezing, the deserture should be deserted. The diameter rotates into the steel embryo with a tapered drill to form a steel pipe. The inner diameter of the steel pipe is determined by the outer diameter of the fixed diameter drill. After the steel pipe is fixed, enter the cooling tower and cool through the water spray. After the steel pipe is cooled, it must be directly straight. After the steel pipe is correct, it will be sent to the metal probe (or hydraulic experiment) for internal explosion. If there are cracks and bubbles inside the steel pipe, it will be detected. After the steel pipe is inspected, it must be selected by strict handmade. After the steel pipe quality inspection, the paint number, specifications, production batch number, etc. are used with paint. And the crane is hung into the warehouse.
Aug 20, 2022
Leave a message
How To Prepare Carbon Steel Pipes
Send Inquiry





